2/01/2010

Bringing over the three wind turbines in Feb

The ferry is booked and the trailer and bits are bought. Jody comes over on the ferry on the 21st Feb and we collect the three wind turbines. Although in a valley we hope to get these all high enough to begin generating out own power....off the grid.